Coldwater Strong Long Leader Float Triple Rig 5/0 Shrimp Fly Kit

Sale price
$34.99
In Stock – Available to Order
Pickup available at FMS-OC

Usually ready in 24 hours

Available at store for purchase

Description

Coldwater Strong – Long Leader Float Triple Rig 5/0 Shrimp Fly Kit

  • Includes non-compressible float
  • Comes with a 3 shrimp fly leader rig
  • Includes 5 × 5/0 shrimp flies in multiple colors
  • Features 35 ft of 120 lb mono line for lead setup
  • Includes a Cuban hand reel for storing mono line
  • Built with high-quality terminal tackle
  • All connections are secured using pneumatic press crimps
  • Designed as a tangle-free, plug-and-play system — just attach mainline, add lead, and fish

You may also like